Peshawar - Karachi Motorway:

  • Karachi – Peshawar Motorway envisages construction/development of a 6-Lane access-controlled Motorway having a total length of 1,100 Km. The proposed Motorway shall be a tolled facility. It shall originate from Karachi through Motorway M-9 (136 Km) up to Hyderabad. From Hyderabad onwards, the proposed alignment shall follow a virgin alignment for 345 Km up to Sukkur. The Sukkur Multan section, 392 Km essentially follows the Left Bank of River Indus.

Scroll to Top